Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
澳门银河
澳门银河
九州体育
365体育
Gambling-app-sales@psycgautier.com
Wade-official-website-support@ftjsgg.com
乐8苹果助手
电子游戏平台
Casinos-in-Macau-contactus@quanticabtl.com
广西机电职业技术学院
356体育
中国兵器工业集团公司
青岛医院网上挂号
金华网
菲丽网
石家庄列表网
星科智能
浙江旭杰环卫设备有限公司
巴黎卡诗中国官方网站
京成科技